See exactly what you get before you order. Download a full-length sample report for any of our services — real structure, real analysis, the same document your council receives.
BRE 209 (2022) daylight, sunlight and overshadowing assessment — VSC, NSL and APSH results with clear mitigation advice.
Site-specific FRA built on live Environment Agency data, with sequential test support and a full SuDS drainage strategy.
EPUK/IAQM screening on official Defra data, with construction dust risk assessment and a condition-ready mitigation plan.
Part L 2021 / SAP 10.2 baseline with the full Be Lean, Be Clean, Be Green energy hierarchy and carbon savings at each stage.
Biodiversity net gain position, water efficiency and urban greening — the sustainability case validation lists now expect.
The official Approved Document G calculation demonstrating the 110 litres per person per day standard, fitting by fitting.
GHA early-stage overheating risk score and the Approved Document O simplified-method check, room by room.
London Plan Policy G5 calculation with the colour-coded plan and Table 8.2 surface schedule boroughs check line by line.
Preliminary risk assessment to BS 10175 — site history, conceptual site model and CIRIA C552 risk screening.
CMP and logistics content written to council proformas — site setup, traffic forecasts, dust, noise and hours controls.
Email your drawings and site address and we’ll send a fixed quote and timeframe — usually within 24 hours. No advance payment.